Badekar-installation planlægning
10,000 kr
København S
I am planning to convert a shower into a bathtub in my newly purchased apartment. I anticipate needing your expertise in plumbing and possibly masonry. The project will require three visits from you, each with specific tasks outlined below. Key Dates: Apartment keys received: June 1st or 3rd. Specific visit dates will be scheduled accordingly. Tasks Overview: Visit 1: Evaluate feasibility for converting the shower to a bathtub. Between 1st and 2nd Visits: If the plan is feasible, I will remove the existing tiles, shower wall, sink, and mirror. Order and receive the bathtub, mounting legs, drain, and overflow kit. Visit 2: 1. Install a new bathtub drain. 2. Relocate floor drain. 3. Make the floor slope correctly: 1% general, 2% under bathtub (I may handle this myself if it exceeds budget or your capability). Between 2nd and 3rd Visits: Once the plumbing infrastructure is set, I will do waterproofing and install new tiles. Visit 3: 1. Install the bathtub (dimensions: 180x80 cm). Note: If this task is out of my budget, I will undertake it myself. 2. Install a new tub and shower mixer tap. 3. Connect the washing machine to the sink's water source and drainage system. An estimated cost breakdown for each step is needed.